Most delays in creative projects do not happen during design; they happen before it starts. An unclear idea, an undefined goal or conflicting feedback from several people all turn into long rounds of revisions and a bigger budget than planned. The fix is usually simple: a clear brief.
What is a design brief, and why does it matter?
A brief, or creative brief, is a short document of one or two pages. The project owner writes it to tell the agency what is needed, for whom, why, and how success will be measured. It is the starting point the agency builds its understanding, quote and timeline on.
A good brief gives you three direct benefits:
- A more accurate quote: the agency understands the real size of the work from day one.
- Fewer rounds of revisions: everyone agrees on the goal before the first design.
- Faster decisions: the decision maker and the approval process are clear from the start.
10 elements every brief needs
1. About the company
Who you are, what you offer and to whom. Three or four lines are enough, with links to your website and social accounts.
2. Project goal
What result do you want from this work? Launching a new product, increasing enquiries, or refreshing the identity before expansion. The more measurable the goal, the clearer the evaluation.
3. Target audience
Who exactly needs to be convinced? Their age, city and interests, and where they usually meet you: in store, on Instagram or in a procurement meeting.
4. Key message
If the audience remembers only one sentence after seeing the work, what should it be? One clear message is stronger than five competing ones.
5. Deliverables
Be precise: the number of designs, sizes, platforms, languages (Arabic, English or both) and the file formats you need at handover.
6. Brand and constraints
Attach your brand guidelines if you have them, plus logo files, fonts and colours, what must be followed or avoided, and any regulatory requirements in your sector.
7. Competitors and references
Name two or three competitors, and share examples of work you like and work you do not, with one line explaining why. A reference without an explanation can be read in a completely different way.
8. Budget
Do not hide the budget. An approximate range helps the agency propose the right solution, instead of a proposal that is bigger or smaller than what you need.
9. Timeline
Set the start date, the first review, the launch date and any occasion linked to the project. If the project is tied to a season such as Ramadan, start early, as we explain in our Saudi seasonal content plan for 2027.
10. Decision maker and approval
Who approves the final work? How many rounds of revisions are expected? Who is the single point of contact with the agency? Settling this early prevents conflicting opinions halfway through the project.
Common mistakes that delay projects
- "We want something creative" with no direction: creativity needs a frame, and the brief is that frame.
- Too many goals in one project: a single ad cannot sell, build awareness and collect data all at once.
- Changing the decision maker mid-project: every new opinion sets the project back.
- References without explanation: you may like an image for its colours while the designer reads it for its style.
- A timeline with no buffer: leave time for internal review and approval, especially before seasons and holidays.
Free brief template to download
We have prepared a brief template that covers all ten elements, in Arabic and English, and opens in Word or Google Docs. Fill it out in under half an hour and share it with your team before sending it to any agency.
An editable Word file that opens in Word and Google Docs.
How we use the brief at ORBIT
We start every project with a short session to go through the brief with you, then send a written summary of the scope, deliverables and timeline before any design begins. From there we follow four clear steps: understand, define, develop, then launch and review.
If your project is about identity, you may also find this useful: When does your company need a brand identity redesign?
Frequently asked questions
What is the difference between a brief and a proposal?
The client writes the brief to explain the need. The agency writes the proposal to explain the suggested solution, scope, cost and timeline.
How long should a creative brief be?
One or two pages are usually enough. What matters is that the answers are clear and specific, not that the document is long.
Do I need a brief for every small project?
Yes, even if it is a short version covering the goal, deliverables, deadline and decision maker. Four clear lines save a lot of time.
What if I do not know the exact budget?
Share an approximate range or an upper limit, and the agency will propose options that fit it.